Case Study: Data Center Solutions
Bridge Data Centers Generator Lift
Project Overview
Superior Machinery was entrusted with a critical heavy lifting project for Bridge Data Centers in Johor Bahru. The mission involved the precise lifting and positioning of 24 backup generators, a crucial component of the data center's power infrastructure. The project's success hinged on flawless execution under a tight schedule.
The Challenge
The primary challenge was the sheer scale and time-sensitive nature of the operation. Lifting 24 heavy generators required not only immense power but also unwavering precision to ensure each unit was placed safely and accurately. The project demanded continuous work to meet a critical deadline, necessitating a meticulously planned, round-the-clock operational strategy to avoid any delays.
Our Solution
To meet these demands, our team implemented a highly coordinated, non-stop operational plan. Our solution was built on precision, safety, and efficiency:
- A powerful 700-ton heavy-lift mobile crane was deployed to provide the necessary lifting capacity and reach for all 24 generators.
- We operated in rotating, round-the-clock shifts, ensuring the project progressed continuously without compromising safety or quality.
- Each lift was executed with exceptional precision by our team of certified riggers and crane operators, following a detailed lift plan for every generator.
- The seamless coordination between shifts allowed us to successfully meet the critical deadline, ensuring the data center's backup power system was ready on schedule.
Project Details
Client
Bridge Data Centers
Location
Sedenak, Johor Bahru, Malaysia
Equipment
700T Mobile Crane
Service
Heavy Lift & Critical Crane Services
Scope
Precision Lifting of 24 Backup Generators